Khalifa International Stadium: Cool under pressure

Posted by AuCom on 10/10/19 13:38

The 2019 IAAF World Athletics Championships in Doha, Qatar have just drawn to a close after 10 days of intense competition. The Khalifa International Stadium, the main venue for the event, is home to the world's first stadium air conditioning system, as well as 86 AuCom medium voltage panels. Following this successful event, the stadium is set to host a number of matches during the upcoming 2022 FIFA World Cup.

Read More

Topics: Projects, Soft Start Control, Success Stories, Building Services, Industry Applications, HVAC


Case Study: 2022 Fifa World Cup Stadium

Posted by AuCom on 12/11/17 10:00

Discover how AuCom's MV soft starters are helping to cool stadiums at the 2022 FIFA World Cup in Qatar, ensuring optimal performance in extreme desert heat.

Read More

Topics: Building Services, Case Study, MV


Case Study: Uptown Midrif District Cooling

Posted by AuCom on 11/09/17 09:00

With a wide range of shops, restaurants, cafes and essential services, Dubai’s Uptown Mirdiff mall is a core component of the Mirdiff community.  In a city with an average high temperature of around 41 °C (106 °F), cooling and air conditioning are crucial for keeping visitors comfortable in any public space. To this end, Uptown Mirdiff relies upon a 4,800 ton capacity cooling plant known as EMICOOL – DCP 10.

Read More

Topics: Building Services, Case Study


Case Study: Tunnel Buenavista

Posted by AuCom on 17/07/17 09:00

Connecting the city of Villavicencio, Colombia to the capital city of Bogota, the Tunel Buenavista (East Tunnel) is a key component in the Autopista al Llano highway and plays a vital role in the nation’s transport network. Stretching more than 4.5km underground, the tunnel is one of the most complex infrastructure challenges in Colombia.

Read More

Topics: Building Services, Case Study


Case Study: Mirae Asset Tower

Posted by AuCom on 18/04/17 09:00

Situated just a block away from AuCom’s China office in Shanghai, engineers at Mirae Asset Tower have recently chosen CSXi soft starters for their pumps and fans to safeguard motors from mechanical and electrical stress.

Read More

Topics: Building Services, Case Study, CSX